EVAROQ — ELECTRIC URBAN MOBILITYinfo@evaroq.com
Electric vehicle production staging environment

PRODUCTION & QUALITY CONTROL

Quality becomes real
when every step is visible.

EVAROQ quality control connects approved configuration, component checks, assembly inspection, functional testing and shipment release.

REAL PRODUCTION ENVIRONMENT

From organised staging
to shipment readiness.

These documentary images show production and logistics environments supporting the EVAROQ program. They are presented without supplier identity or location disclosure.

THE EVAROQ CONTROL PATH

Eight gates before release.

01

Configuration approval

Model · battery · controller · trim

02

Incoming checks

Key electrical · structural · braking parts

03

Frame & chassis

Fit · fasteners · alignment

04

Electrical assembly

Wiring · connections · insulation

05

Functional test

Drive · brake · light · display · charge

06

Road function

Response · stability · abnormal noise

07

Identity & finish

Colour · surfaces · EVAROQ marks

08

Shipment release

Documents · protection · packing

CONFIGURATION-SPECIFIC EVIDENCE

Documents must match
the vehicle being shipped.

EVAROQ does not present a document as universal when it applies only to a specific battery, component, model or destination. Applicable documentation is confirmed against the approved order configuration.

EVAROQ Q

THE FINAL MARK

Checked for the approved configuration.
Ready to carry the EVAROQ Q.

@